An important piece of any project plan and development cycle should always be a formal testing process. It’s surprising how often we see this skipped over or skimped on. It’s important to not only test the call flow itself, including all the branches and options, but also unexpected inputs and error conditions, and finally load testing.

We see many IVR systems where the only testing done was a handful of test calls to verify the call flow. Some common issues that should be considered include:

1、What happens if the caller hangs up unexpectedly?

2、What about if the caller enters the wrong number of digits, or the wrong termination digit?

3、What happens if there are no digits entered, how many times does the system retry? If the retries fail, does the system gracefully end the call or transfer to an agent?

4、If the system is using ASR, how does it handle background noise or speakerphone calls?
Is it able to differentiate the responses of callers with different accents?

5、Does the system gracefully handle prompt playback failures or text-to-speech errors?
Finally, especially in IVRs which integrate with other business systems, databases, or web services, it is essential to do proper load testing and determine how the system performs under a large call volume. Do database/web service calls return in a timely fashion? Are your business systems (CRM, etc) negatively impacted by the load from the IVR with a large amount of incoming calls?

6、Proper and thorough testing before putting the IVR system into production can really make the difference between a stable, smooth launch and unexpected outages and frustrated callers down the road.

CTI论坛报道



相关阅读:
[英文]Pronexus IVR助Scripps报业集团提高效率 2011-01-05
[英文]IVR监控工具帮助呼叫中心处理技术问题 2010-12-14
[英文]如何确保最大化关键任务IVR系统正常运行时间 2010-12-10
[英文]处理ivr升级的建议 2010-11-24
[英文]Connect NZ选择VBVoice重新开发IVR 2010-11-04

分类信息:  CTI文摘_与_CTI平台技术  CTI文摘_与_IVR技术  CTI平台技术_与_IVR技术